Bandra Kurla Complex, known to most people as BKC, the new financial hub of Mumbai,and also the site of the Make in India Centre recently, has got a bonus Gold Coin in terms of transport.
Tata Starbus has bagged an order for its new Diesel-Electric Hybrid AC bus from the MMRDA. These buses will be operated by BEST as part of their fleet, thus complementing their existing AC fleet.
As per a notification on MMRDA’s website, these buses will be owned by MMRDA, maintained by Tata Motors for a period of five years and operated by BEST. Further, they will operate in dedicated bus lanes within BKC, connecting the District to Bandra Railway Station, Kurla Railway Station and Sion Railway Station.
These buses are set to be a game changer. The reasons being:
- They are Hybrid buses, that too, Electric Hybrid. The hype that the bus can generate is enough to get people flowing in and once that is in motion, can be sustained easily. The Hype generated when BMTC got it’s BYD Electric Bus was what made it so successful.
- Tata has always delivered on the design front, right from their first Starbus Model that was introduced in 2004, which is now used on the Fort Pheri route. Unlike Volvo’s new Hybrid bus, which looks like a regular Volvo, this looks different, and good design is the first step to getting more crowd.
Now coming to Kurla and Sion Stations.
Sion station is set to get a massive makeover. The road bridge connecting Dharavi /LBS Marg to Rani Laxmi Chowk that houses the entrance to the station is set to be demolished to make way for the Fifth and Sixth railway lines connecting Ghatkopar to CST. This means that the station entrance will be shifted, and is good news in the long run.
Kurla Station [West] is the proposed site for MMRDA for the Station Area Transit Improvement Scheme [SATIS], which will see an elevated platform for buses and autos, similar to the structure at Thane Station West.
The new buses will mostly be housed at BEST’s newest depot, the Kala Killa Depot [KK] which was earlier an empty plot adjacent to the Dharavi Depot where buses of the Kurla Depot were parked during its reconstruction. The depot became operational on 31st January 2016.
Another major project for BKC is a ropeway. After CIDCO proposed a ropeway between Vashi and Kopar Khairane and Vashi and Ghatkopar, the MMRDA has now proposed a new ropeway connecting Kurla and BKC. The ropeway has been considered on this route given the congestion and taking land availability as well.
Another update on this stretch is from the Mumbai Metro Rail Corporation Limited [MMRCL].
Amidst all controversy and outrage from Environmentalists and the National Green Tribunal [NGT], the latter of which has failed to do its duty and rakes up controversy needlessly, the MMRCL has silently been doing a good job in acquiring land for the underground Metro which will connect Colaba, Cuffee Parade, BKC Mumbai International Airport and SEEPZ.
Today at MMRC, 118 tenements were allotted to PAPs affected by BKC Metro station. pic.twitter.com/59umEAghSa
— MumbaiMetro3 (@MumbaiMetro3) March 23, 2016
With all these updates, the city’s newest Business District is all set to be given the premium connectivity it deserves.